- Project
- Ridge Road House
- Town
- Stone Ridge, NY
- Scope
- New home
- Area
- 2,600 sq ft
- On site
- 34 weeks
- Sheet
- A-201
Plumb,level andsquare.
New homes, additions and renovations across the Hudson Valley. One crew from the footings to the final walk-through, on a fixed, itemized price.
- Fixed, itemized quotesevery line priced before we start
- One crew, start to finishthe people who frame it also trim it
- Licensed and fully insuredcertificates sent with every quote
What we build.
Five kinds of work, all done by our own crew. Typical times run from the first site visit to handover.
-
New homes
Custom homes from 1,400 to 4,000 sq ft, from the survey stakes to the certificate of occupancy.
Typical25–38 weeks
-
Additions
Rear and side additions, second storeys and sunrooms, tied into your house so the seam disappears.
Typical13–26 weeks
-
Kitchens and baths
Full gut renovations: new layout, plumbing, wiring, cabinets, tile and fixtures.
Typical6–14 weeks
-
Basements
Finished basements with egress windows, insulation, and drainage that keeps them dry.
Typical6–13 weeks
-
Structural repairs
Sagging floors, settled foundations, rotten sills and beams replaced, with the engineer’s stamp.
Typical1–6 weeks
The build, in order.
Every job runs the same six stages. Here is a 2,200 sq ft new home: scroll and watch it go up, layer by layer.
1Site visit and surveyWeek 1
- 1
Site visit and survey
Week 1
We walk the site with you, measure, check soils, setbacks and the slope, and leave with a list of questions.
- 2
Drawings and permits
Weeks 2–7
Our designer draws the plans, the engineer stamps the structure, we file for permits and send the fixed, itemized quote.
- 3
Foundation
Weeks 8–11
Excavation, footings, foundation walls, footing drains, waterproofing and the slab, each inspected before backfill.
- 4
Framing and roof
Weeks 12–16
Floor systems, walls, rafters and sheathing, then the roof goes on and the house is dried in.
- 5
Enclosure and systems
Weeks 17–22
Windows, doors and siding outside; plumbing, wiring, heating and insulation inside, inspected before the walls close.
- 6
Finishes and walk-through
Weeks 23–30
Drywall, trim, floors, kitchen, stairs and paint. We walk every room with you and close the punch list.
Plan your project.
Pick the job, the size and the finish. See the schedule and a cost range before anyone visits the site.
Schedule26–32 weeks
Cost range$550k–$730k
A range for planning, before we see the site. Your quote is fixed and itemized.
Request a quote for thisRecent projects.
Four jobs from the last two seasons, drawn from our own sheets. New work is drawn in blue.
- Project
- Pearl Street Addition
- Town
- Kingston, NY
- Scope
- 2-storey addition
- Area
- 620 sq ft
- On site
- 19 weeks
- Sheet
- A-102
- Project
- Mill Hill Kitchen
- Town
- Saugerties, NY
- Scope
- Kitchen renovation
- Area
- 240 sq ft
- On site
- 9 weeks
- Sheet
- I-301
- Project
- Orchard Lane Barn House
- Town
- New Paltz, NY
- Scope
- New home
- Area
- 1,900 sq ft
- On site
- 30 weeks
- Sheet
- A-204
Licensed, insured, local.
- Insured on every job. General liability and workers’ compensation; certificates come with the quote.
- Permits in our name. We file them, book every inspection and keep the paperwork for you.
- One-year workmanship warranty. In writing, on everything we build.
We work within 40 miles of Kingston, NY: Kingston, Woodstock, Saugerties, Rhinebeck, Red Hook, Hudson, Catskill, Stone Ridge, High Falls, Rosendale, New Paltz and Poughkeepsie.
Request a quote.
Tell us about the job. The quote comes back fixed and itemized, line by line.